Design for the replacement of the Laboratory air handling units at DCH Regional Medical Center. Pinnacle Engineering developed a plan to maintain required air exchange rates, temperatures, and humidity ranges during the installation of the new air handling units without ever shutting the laboratory down. The plan development included a phasing plan for installing a bypass duct to serve the required spaces from a different air handler, removing the existing equipment, and installing the new equipment. Total project budget $ 850,000