As the Mechanical Engineer for the Design/Build team, Pinnacle Engineering provided Mechanical, Plumbing, & FP systems design for the initial construction of a 200,000 SF automotive manufacturing plant in 2000.  In numerous projects since Pinnacle Engineering has provided engineering designs for modifications to the process piping, gas, air and chilled water systems as the facility’s needs and capabilities have changed over the years.   

Martinrea