Jefferson State Community College

Birmingham, Alabama



Chemistry Laboratory Fume Hood Renovation: Replacement of existing fume hoods in four chemistry laboratories in existing classroom building; $300,000 construction budget.

Florida State University

Tallahassee, Florida



College of Medicine Research Facility: Four-story research facility for support of College of Medicine; 48 high-tech laboratories, including a BSL Level III laboratory for the study of infectious diseases caused by airborne pathogens, cadaver storage containers, continual-exhaust hood, biosafety cabinets; construction budget $48 million construction budget.

Judson College

Marion, Alabama



Lowder Science Building: Mechanical, Electrical, and Plumbing systems design for 45,000 square foot Classroom and Laboratory Facility; $9.5 million construction budget.

Auburn University

Auburn, Alabama



  • Swine Research Facility and Laboratory: Provided M/P engineering services for single story, 5,500 SF animal research facility.
  • Meats Laboratory Demonstration Kitchen Build-out: Provided M/P engineering services for 750 SF     kitchen renovation.
  • Poultry Disease Research Laboratory: Provided M/P engineering services for 900 SF animal research facility. M/P budget of approximately $60,000.



Florida Atlantic University

Boca Raton, Florida



  • Behavioral Science Building: Five story, 50,000 square foot renovation including laboratory and office space/$8 million.
  • Sanson Science Building: Biological Science Building renovation including adding a 300 seat auditorium to both the Biological Science building and electronic systems for distance learning/ $11 million.